Fiscal impact reports (FIRs) are prepared by the Legislative Finance Committee (LFC) for standing finance
committees of the NM Legislature. The LFC does not assume responsibility for the accuracy of these reports
if they are used for other purposes.
Current FIRs (in HTML & Adobe PDF formats) are a vailable on the NM Legislative Website (legis.state.nm.us).
Adobe PDF versions include all attachments, whereas HTML versions may not. Previously issued FIRs and
attachments may be obtained from the LFC in Suite 101 of the State Capitol Building North.
F I S C A L I M P A C T R E P O R T
SPONSOR Stewart
ORIGINAL DATE
LAST UPDATED
2-4-07
HB 610
SHORT TITLE Solar Collector Construction Standards
SB
ANALYST Woods
APPROPRIATION (dollars in thousands)
Appropriation
Recurring
or Non-Rec
Fund
Affected
FY07
FY08
NFI
NFI
(Parenthesis ( ) Indicate Expenditure Decreases)
Relates to HB 611
SOURCES OF INFORMATION
LFC Files
Responses Received From
Energy, Minerals, and Natural Resources Department (EMNRD)
SUMMARY
Synopsis of Bill
House Bill 610 amends the Solar Collector Standards Act (NMSA 1978, 71-6-4 through 71-6-
10) by revising existing law (page 1—page 5, line 22), adding new material (page 5, line 23—
page 6, line 20), and repealing a section (Section 71-6-9, page 6, lines 21-22). It is to be
effective July 1, 2007. Existing material in the law on definition of a solar collector is revised as
follows:
(a) to not include site-assembled custom installations of solar collectors (currently
included as meeting solar collector definition);
(b) to define passive system in more detail as another system type that is not included
(currently not included as meeting solar collector definition).
pg_0002
House Bill 610 – Page
2
All other language revisions are minor, suggested for grammatical improvement or clarification
purposes, and do not affect the content of the existing law.
House Bill 610 additionally provides for rulemaking to establish standards for new construction
to accommodate solar collectors. There are two sections of new material, described as follows:
(a) Construction Standards to Accommodate Solar Collectors—Rulemaking. The bill
proposes that a joint effort of EMNRD and Regulation and Licensing Department
(RLD) entities (Construction Industries Division-CID and Construction Industries
Commission-CIC) establish new regulations (as rules, standards, or codes) to require
that all new construction be “solar ready", so that solar systems can be accommodated
by any building or facility after construction of the original building or facility. This
would amend the Solar Collector Standards Act.
(b) Standards to Accommodate Solar Collectors. The bill proposes that the above joint
effort also be included as a new section in the Construction Industries Licensing Act.
House Bill 610 repeals NMSA 1978, Section 71-6-9, which states that the credit against personal
income tax provided by NMSA 1978, Section 7-2-16 shall not apply to the purchase of a solar
collector unless certified pursuant to the Solar Collector Standards Act. This is repealed because
NMSA 1978, Section 7-2-16 has previously been repealed.
FISCAL IMPLICATIONS
EMNRD anticipates no direct fiscal impacts; however, it suggests that state agencies would be
impacted by additional workload and the need for additional resources for implementation,
which would become an indirect fiscal impact in future years.
See ADMINISTRATIVE IMPLICATIONS.
SIGNIFICANT ISSUES
EMNRD indicates that it does not actively administer the Solar Collector Standards Act, due to
changing incentives and solar industry configuration since the phase-out of a previous solar tax
credit program in the 1980s. The newer solar tax credit program established in 2006 and other
solar incentive programs operate successfully without applying the Solar Collector Standards
Act. A primary purpose of the Act, to test and certify solar collectors, is conducted adequately to
meet current state needs by the Solar Rating and Certification Corporation.
Site-assembled custom solar installations should not be removed from the Solar Collector
Standards Act for the purpose of addressing the regulations for “solar ready" construction. There
are other situations where—if EMNRD were to actively administer the existing Solar Collector
Standards Act in the future—site-assembled installations should remain included for their
regulation for conventional solar installations as integrated with new construction or retrofits.
For example, EMNRD is aware of a solar thermal collector that utilizes a pitched metal roof as
the collector. This collector type is assembled at the site and could be quite valuable as a retrofit
or to address visual issues. Instead, the site-assembled case should be identified as not available
for the new material in HB610 addressing “solar ready" construction.
pg_0003
House Bill 610 – Page
3
EMNRD anticipates that the requirement for “solar ready" construction will be contentious
between the regulator (government) and industry (developers, builders, contractors). In order to
establish regulations for “solar ready" construction, EMNRD recommends that a government-
industry-consumer working group be formed to address issues affecting the solar and
construction industries. EMNRD knows from experience that code changes require a great
amount of time and effort for success. For example, it took 15 years to update New Mexico’s
energy code.
PERFORMANCE IMPLICATIONS
EMNRD notes that the definition of solar collector does not include photovoltaic (PV) modules
for conversion of sunlight into electricity. Such an omission would greatly limit the practical
application of “solar ready" construction, due to the increasing solar industry activity of PV
systems and potential need to expedite distributed generation of electricity.
ADMINISTRATIVE IMPLICATIONS
EMNRD anticipates that the program workload in clean energy initiatives will increase. The
new material as proposed by HB610 would result in regulations for “solar ready" construction,
through the collaboration of EMNRD and RLD. EMNRD agrees that “solar ready" construction,
if implemented, should address the issues stated in HB 610—including roof orientation; solar
access; electrical, mechanical, and structural infrastructure—but staffing and other resources are
not currently available to handle the additional workload. Additional staffing and funding is
necessary for EMNRD to assist with implementation of the HB 610 “solar ready" construction
provisions.
CONFLICT, DUPLICATION, COMPANIONSHIP, RELATIONSHIP
Relates to House Bill 611: Solar Collector Definitions & Restrictions. NOTE: EMNRD indicates
that the definitions for “solar collector" in the two bills are not the same.
TECHNICAL ISSUES
EMNRD notes that there is no due date specified for establishment of regulations for “solar
ready" construction. The process could commence for establishing regulations, but no end date
would be required by law. The process could last for a long time without progress. Further, a
lead agency is not specified for the effort to establish regulations for “solar ready" construction.
RLD should be identified as the lead agency.
ALTERNATIVES
EMNRD indicates that additional private and corporate incentives for solar systems could be
provided by government, utilities, and financial institutions to the point at which the effective
unit costs for fossil-fuel-based electricity and heating are equal to solar system costs.
WHAT WILL BE THE CONSEQUENCES OF NOT ENACTING THIS BILL
EMNRD suggests that solar market development in New Mexico will continue through the
support of government and utility incentives, changing economic conditions for fossil-fuel-based
pg_0004
House Bill 610 – Page
4
electricity and heating; and the voluntary efforts of consumers and building owners choosing
solar technologies. Developers, builders, contractors, and building owners will not be required
to construct “solar ready" facilities.
BFW/nt