Fiscal impact reports (FIRs) are prepared by the Legislative Finance Committee (LFC) for standing finance
committees of the NM Legislature. The LFC does not assume responsibility for the accuracy of these reports
if they are used for other purposes.
Current FIRs (in HTML & Adobe PDF formats) are a vailable on the NM Legislative Website (legis.state.nm.us).
Adobe PDF versions include all attachments, whereas HTML versions may not. Previously issued FIRs and
attachments may be obtained from the LFC in Suite 101 of the State Capitol Building North.
F I S C A L I M P A C T R E P O R T
SPONSOR Culbert
DATE TYPED 02/02/05 HB 459
SHORT TITLE
La Barranca Drainage Facility Improvements
SB
ANALYST Moser
APPROPRIATION
Appropriation Contained Estimated Additional Impact Recurring
or Non-Rec
Fund
Affected
FY05
FY06
FY05
FY06
$368.0
Non-Recurring General
(Parenthesis ( ) Indicate Expenditure Decreases)
SOURCES OF INFORMATION
LFC Files
Responses Received From
Department of Transportation
SUMMARY
Synopsis of Bill
House Bill 459 would provide to the New Mexico Department of Transportation (NMDOT)
three hundred sixty-eight thousand dollars ($368,000) from the general fund for the first phase to
improve severe erosion and drainage problem at the lower La Barranca facility in Sandoval
County by stabilizing the reach directly downstream of the New Mexico highway 528 crossing;
in order to protect the structure crossing the highway, the existing soil cement drop structure, the
existing waste water treatment plant, and the adjacent residential areas from erosion damage.
Significant Issues
The major issues identified by the NMDOT pertaining to the bill are the following:
•
Drainage improvement could require over one million dollars ($1M) or more than three
times of the amount of this first phase of $368,000 to reshape the arroyo to its historic condi-
tion. Additional funding will be required in the future.
•
Materials were mined downstream of the soil cement drop structures several years after its
completion of construction; and could have caused the head cut of approximately 10 feet.