Fiscal impact reports (FIRs) are prepared by the Legislative Finance Committee (LFC) for standing finance
committees of the NM Legislature. The LFC does not assume responsibility for the accuracy of these reports
if they are used for other purposes.
Current FIRs (in HTML & Adobe PDF formats) are a vailable on the NM Legislative Website (legis.state.nm.us).
Adobe PDF versions include all attachments, whereas HTML versions may not. Previously issued FIRs and
attachments may be obtained from the LFC in Suite 101 of the State Capitol Building North.
F I S C A L I M P A C T R E P O R T
SPONSOR Nuñez
DATE TYPED 1/28/2005 HB 194
SHORT TITLE Construction Materials Mining Act
SB
ANALYST Aguilar
APPROPRIATION
Appropriation Contained Estimated Additional Impact Recurring
or Non-Rec
Fund
Affected
FY05
FY06
FY05
FY06
$250.0
Indeterminate Recurring General Fund
$250.0 Recurring
Construction
Materials Min-
ing Act Fund
(Parenthesis ( ) Indicate Expenditure Decreases)
REVENUE
Estimated Revenue
Subsequent
Years Impact
Recurring
or Non-Rec
Fund
Affected
FY05
FY06
$250.0
$250.0 Recurring Construction Mate-
rials Mining Act
Fund
(Parenthesis ( ) Indicate Revenue Decreases)
SOURCES OF INFORMATION
LFC Files
Responses Received From
Energy, Minerals and Natural Resources Department (EMNRD)
Commissioner of Public Lands (SLO)
New Mexico Department of Transportation (NMDOT)
SUMMARY
Synopsis of Bill
House Bill 194 creates the Construction Materials Mining Act fund.
pg_0002
House Bill 194 -- Page 2
HB 194 appropriates $250 thousand from the general fund to the Construction Materials Mining
Act Fund for use by the Energy, Minerals and Natural Resource Department in carrying out the
purpose of the Construction Materials Mining Act.
HB 194 establishes a regulatory oversight program for construction materials mining operations
within the Mining and Minerals Division of the Energy, Minerals and Natural Resources De-
partment.
Construction mining operations will be required to obtain a permit which must include an ap-
proved reclamation plan and financial assurance.
This bill further authorizes citizen suits for violation of rules, orders or permits and suits against
EMNRD for failure to perform nondiscretionary acts.
Significant Issues
HB 194 applies to operations engaging in mining any rock “that is typically excavated or quar-
ried for use in construction or road building”. Milling or other off-site processing of materials
and any excavation or grading of construction materials by a property owner or lessee solely for
use on-site is not covered by the provisions of this bill.
Of note is the exception of caliche from the provisions of the act. Caliche is mined heavily
throughout the state from a number of small pits and many times these pits are abandoned once
the material is removed.
According to EMNRD, this bill contains a Citizen’s Suit provision. Currently only two other
acts in the state contain similar provisions, both impact the mining industry. These provisions
may discourage development in the state.
According to the Energy, Minerals and Resources Department, the bill expressly states that the
Act does not preempt the authorities of political subdivisions to regulate mining operators under
the zoning and land use authority. This language will allow for multiple layers of regulation of
small mining operators. It also can create a “crazy quilt” of rules with programs differing in
every county. Differences in standards will cause confusion that will be expensive to resolve in
court and, again will discourage development. The bill should clarify what case law has deter-
mined for other mining programs. That is, the state law preempts county or city ordinances in the
areas regulated by the state law. This leaves local government to address areas not regulated by
state programs, especially zoning questions and off-site impacts.
According to the Highway and Transportation Department, this bill may create uncertainty in the
availability of construction materials.
The bill establishes a streamlined permitting process for operations with less than five acres of
disturbance, or less than ten acres of disturbance if the operation will produce materials solely for
use under a government contract that must begin within a specified short time frame. This should
help to address concerns that the permitting process should not unduly delay government con-
struction activities.
This bill creates the “Construction Materials Mining Act fund”. This fund is created within the
state treasury and is a nonreverting fund. An appropriation of $250 thousand is included in this
bill for the purposes of carrying out the purposes of the Act.
pg_0003
House Bill 194 -- Page 3
The State Land Office notes under New Mexico case law, state trust lands are not subject to local
ordinances. This may stand in conflict with the portion of the bill providing that the Act does not
preempt authority of local subdivisions to regulate land use, zoning and off-site impacts of min-
ing operations
PERFORMANCE IMPLICATIONS
At present the Energy, Minerals and Natural Resources Department (EMNRD) does not have
staff to implement this program and will need to create a new program for this purpose. New
performance measures will be established to measure its performance.
EMNRD notes The act establishes a very short, and arguably unworkable, timeframe to establish
a program, promulgate rules and procedures, process applications and issue permits for all exist-
ing mining operations covered by the act. The act would be effective July 1, 2005. MMD must
adopt rules by October 1, 2005 and all mining operations must have a permit by December 31,
2005. Depending on who is covered, MMD currently estimates that there may be between 100
and 250 operations that will fall under the act.
FISCAL IMPLICATIONS
The appropriation of $250 thousand contained in this bill is a recurring expense to the general
fund. Any unexpended or unencumbered balance remaining at the end of fiscal year 2006 shall
revert to the Construction Materials Mining Act fund.
This bill creates a new fund and provides for continuing appropriations. The LFC objects to in-
cluding continuing appropriation language in the statutory provisions for newly created funds.
Earmarking reduces the ability of the legislature to establish spending priorities.
ADMINISTRATIVE IMPLICATIONS
EMNRD is concerned the new program will require a number of new FTEs. These will include
engineers, inspectors, permit writers and staff support. Not including shared administrative and
legal support from the division, the coal and hard rock programs currently employ between 8
FTE and 10 FTE. We conservatively estimate that the new program will require 6 new FTE.
TECHNICAL ISSUES
EMNRD has provided the following amendments for the legislature’s consideration:
A. The bill establishes time deadlines for adopting rules and submitting and approving permit
applications that are extremely short and likely unworkable. We propose the following amend-
ments:
Section 4. MINING OPERATION PERMITS REQUIRED.--Except as otherwise pro-
vided in this section, no person shall conduct a mining operation after December 31, 2006
without a permit issued by the division. For good cause shown, the division may allow a
mining operation to operate without a permit for a stated period not to exceed twelve
months after December 31, 2006 if the division has received a timely and complete per-
mit application for the mining operation prior to December 31, 2006.
pg_0004
House Bill 194 -- Page 4
Section 5. MINING OPERATION RULES.--Prior to October 1, 2006, the division shall
adopt and promulgate, with the secretary's approval as required in Subsection E of Sec-
tion 9-1-5 NMSA 1978, rules to carry out the provisions of the Construction Materials
Mining Act, including rules:
B. We propose that penalties paid under the Act be deposited in a fund for the reclamation of
abandoned mines. The following provides for penalties to be deposited in a fund already estab-
lished in the Mining Act and can be added to Section 13:
C. All money received from administrative or court-imposed penalties shall be delivered to the
state treasurer and deposited in the "inactive or abandoned non-coal mine reclamation fund" es-
tablished pursuant to Subsection B of Section 69-36-19 NMSA 1978. Money in the fund is ap-
propriated to the department to conduct reclamation activities on abandoned or inactive non-coal
mining areas. Any unexpended or unencumbered balance remaining in the inactive or aban-
doned non-coal mine reclamation fund at the end of a fiscal year shall not revert to the general
fund but shall remain and accrue to the benefit of the inactive or abandoned non-coal mine rec-
lamation fund.
D. In Section 12, under the list of requirements needed before the State can issue a permit, is the
mandate for the State to “adequately address” all public concerns raised during the public hear-
ing. At public hearings, citizens will often raise issues that are beyond the authority of the
agency to address. This requirement implies that the agency will address all issues, even those
that are beyond its scope. We propose the following amendment.
Section 12. PERMITS--ISSUANCE--SUSPENSION AND REVOCATION.--
A. The division shall issue the permit for a mining operation if it finds that:
(6) public concerns expressed during public hearings, which are within the scope of the
Construction Material Mining Act, are adequately addressed;
OTHER SUBSTANTIVE ISSUES
Mining of construction materials is currently subject to lease requirement, including reclamation
provisions, if the operations are on state or federal lands. It will be necessary to coordinate with
these agencies when developing regulations and permits for these operations, as the act will ap-
ply to these lands.
The act does not address the off-site impacts of construction materials mining operations, such as
noise, dust, truck traffic and certain visual impacts. The main focus of this bill is land reclama-
tion and on-site impacts.
The following section contain a synopsis of each section and overview from the New Mexico
Department of Transportation (NMDOT).
PA/lg
pg_0005
House Bill 194 -- Page 5
New Mexico Department of Transportation
1. The administrative machinery required by this legislation may be underestimated. The num-
ber of applications for permits could number in the thousands.
2. The application procedures require information that may not be known at the time the permits
are sought.
3. Many Contractors explore areas to determine if material is available before submitting a bid.
These Contactors will have to file applications for, and obtain a permit, even if they are not later
awarded a contract.
4. The public notice and public hearing provisions may result in significant delays that cannot be
quantified.
5. Administration of the Financial Assurance provisions may pose a significant challenge to the
Division.
6. The Division’s procedures for investigation and determining violations will pose delays that
cannot be quantified.
7. A contractor must explore and obtain necessary permits for material sources in a short time
frame. Projects typically receive only a 30-day advertisement. This bill would allow up to 60
days for the Division to issue a permit under the Streamlined Permit Procedure. This would not
allow exploration to begin within the time frames for project advertisement set by the Procure-
ment Code. Even if the contractor started the permit process when the project is first advertised,
he would not know at the time of submitting his bid if the permit would be issued or denied.
This would impact the unit bid prices established for the surfacing material items. Because of
the involved permitting process and the uncertainty in being awarded a contract, Contractors will
be unable secure sources well in advance of construction to establish prices. Provision for public
hearings may contribute to further delays.
8. Pit owners may not have the financial resources to make financial assurances acceptable to
the Division. This legislation may put out of business many small pit owners who rely on supply
of construction materials to public works projects for their livelihood.
9. The NMDOT is subject to the same permit requirements, and civil and criminal sanctions, as
is any other construction materials mining operator.
10. This proposed legislation would increase the time necessary for securing construction mate-
rials by permit requirements, public review, and dispute resolution. The NMDOT operates
within tight time constraints imposed by the STIP that may not readily accommodate this permit
process.
11. Contractor claims may escalate if permit issues in any way delay Contractors after award.
12. Overall project costs may escalate and project delays may increase.
13. Caliche is exempt from the Act, yet no reason for this exemption is provided.
pg_0006
House Bill 194 -- Page 6
14. The Act applies to any land in New Mexico for which a construction materials mining activ-
ity is contemplated. It is unclear under what jurisdiction the Act may extend to federal lands or
Indian Lands.
15. The Streamlined Procedure is limited to 10 acres. This threshold appears arbitrary, as more
than 10 acres may be needed to supply the needs of a public works project because of quantities
of acceptable material within the pit, haul distance to suitable deposits, or the need to use the pit
for multiple projects.
16. The Streamlined Procedure is unavailable if the operator has two separate pits within ½ mile
of each other. It is unclear why there is such a limitation given the concurrent demands of fed-
eral, state and local public works construction in some areas of the state.
17. Except for obtaining permits under the Streamlined Procedure, it is unclear what time limits
are established for obtaining a permit. Given the Notice and Public Hearing requirements, per-
mits could be subject to significant delays.
18. If contractors are found to be in violation of the Act, their pit operations are made subject to a
cessation order, and construction materials for a project cannot be obtained, delays in construc-
tion will occur. If this is the only material source, the project may be indefinitely delayed or
cancelled at great expense to the NMDOT.
19. Giving the right to the public to file suit may result in significant project delays. Any person
having an interest that may be adversely affected is authorized to sue and thereby delay the pro-
ject. Such persons may include environmentalists, adjoining property owners, or disgruntled
contractors who were not low bidders on the project.