NOTE: As provided in LFC policy, this report is
intended only for use by the standing finance committees of the
legislature. The Legislative Finance Committee does not assume
responsibility for the accuracy of the information in this report when used for
other purposes.
The most recent FIR
version (in HTML & Adobe PDF formats) is available on the Legislative
Website. The Adobe PDF version includes
all attachments, whereas the HTML version does not. Previously issued FIRs and attachments may be
obtained from the LFC in
SPONSOR: |
SJC |
DATE TYPED: |
|
HB |
|
||
SHORT TITLE: |
Water Conservation Plans for Electric Plants |
SB |
172/CSJC |
||||
|
ANALYST: |
Valenzuela |
|||||
APPROPRIATION
Appropriation
Contained |
Estimated
Additional Impact |
Recurring or
Non-Rec |
Fund Affected |
||
FY03 |
FY04 |
FY03 |
FY04 |
|
|
|
|
|
$72.6 |
Recurring |
General
Fund |
|
|
|
|
|
|
(Parenthesis
( ) Indicate Expenditure Decreases)
Duplicates House Bill 292
Legislative Finance Committee files
Responses
Received From
Public
Regulation Commission (PRC)
Energy,
Minerals and Natural Resources Department (EMNRD)
Department
of Environment (NMED)
SUMMARY
Synopsis of the SCONC Amendment
The
Senate Conservation Committee (SCONC) amendment to Senate Bill 172 makes
several substantive revisions to the original bill. First, the amended bill
would grandfather existing electric generating plants from the requirements of
the bill and thus apply only to new facilities, generating 300 MW, constructed
after
The amendment strikes in its entirety the
sections that require a detailed cost-benefit comparison between wet cooling
and dry cooling, that require the State Engineer to recommend changes or
additions to the power plant application, and that require public noticing and
hearings for the application.
Synopsis
of Original Bill
Senate Bill 172 would
make three major changes to existing statute: (1) amends the statute to expand
the PRC authority over siting for electric generating plants of 50 megawatts
(MW) or more; (2) adds a new section to the Public Utility Act that prohibits
PRC approval of construction or expansion of an electric generating plant that
uses more than 100 acre-feet of water per year without a water conservation
plan that provides evaluations of water conservation techniques such as dry
cooling; and (3) repeals the delayed repeal (July 1, 2003) of the Public
Utility Act, Chapter 63 Article 7 NMSA 1978, the Telephone and Telegraph Company
Certification Act, the New Mexico Telecommunications Act, and the Cellular
Telephone Services Act.
Significant
Issues
The new section added to the Public Utility Act is designed to encourage electric utilities to consider water-saving operating technologies, such as dry cooling. The bill includes several provisions outlining requirements for a utility who intends to construct or expand its plants.
To date, several companies have planned
construction of more than 15 power plants throughout
FISCAL IMPLICATIONS
Senate Bill 172 does
not contain an appropriation. However, enactment could increase the workload on
the Utility Division staff. The PRC reports that it will require one additional
staff position to deal with the increased workload. The estimate for this staff
position, including benefits, is $72.6, which would be paid from the general
fund.
MFV/sb/njw:yr