NOTE:  As provided in LFC policy, this report is intended only for use by the standing finance committees of the legislature.  The Legislative Finance Committee does not assume responsibility for the accuracy of the information in this report when used for other purposes.

 

The most recent FIR version (in HTML & Adobe PDF formats) is available on the Legislative Website.  The Adobe PDF version includes all attachments, whereas the HTML version does not.  Previously issued FIRs and attachments may be obtained from the LFC in Suite 101 of the State Capitol Building North.

 

 

F I S C A L   I M P A C T   R E P O R T

 

 

 

SPONSOR:

Cisneros

 

DATE TYPED:

3/13/03

 

HB

 

 

SHORT TITLE:

Rio Grande Gorge Bridge Pedestrian Barriers

 

SB

SJM101

 

 

ANALYST:

Reynolds-Forte

 

APPROPRIATION

 

Appropriation Contained

Estimated Additional Impact

Recurring

or Non-Rec

Fund

Affected

FY03

FY04

FY03

FY04

 

 

 

 

 

$50.0

Non-Rec

State Road Fund

 

 

 

 

 

 

(Parenthesis ( ) Indicate Expenditure Decreases)

 

SOURCES OF INFORMATION

 

Responses Received From

State Highway and Transportation Department

 

SUMMARY

 

     Synopsis of Bill

 

SJM requests that the State Highway and Transportation Department conduct a feasibility study in cooperation with the Department of Public Safety for the construction or installation of pedestrian barriers and safety-enhancing improvements to the Rio Grande Gorge Bridge on US Highway 64 in Taos County.

 

FISCAL IMPLICATIONS

 

The State Highway and Transportation Department estimates the cost of the feasibility study to be approximately $50.0.  They estimate that installation or construction of the barriers will be $200.0 to $400.0. 

 

PRF/njw/ls