STATE OF NEW MEXICO
48TH LEGISLATURE - FIRST SESSION - 2007
CAPITAL PROJECTS FOR REPRESENTATIVE PAUL C. BANDY
HOUSE CAPITAL OUTLAY REQUEST 3
I request that the following be funded:
Paul C. Bandy
to the department of environment
BLANCO MDWC/MSWA WATER SYSTEM IMPROVE
three hundred thousand dollars ($300,000) to plan, design and construct infrastructure for the
water system for the Blanco mutual domestic water consumers and mutual sewage works
association in San Juan county
FLORA VISTA WWATER SYSTEM CONSTRUCT
one million five hundred twenty-five thousand dollars ($1,525,000) to plan, design and
construct a wastewater system in Flora Vista in San Juan county
NORTH STAR DWC/MSW CO-OP WATER SYSTEM IMPROVE
four hundred thousand dollars ($400,000) to plan, design and construct improvements to the
water distribution system for the North Star domestic water consumers and mutual sewer
works cooperative in San Juan county
AZTEC RESERVOIR #3 CONSTRUCT
one million dollars ($1,000,000) to plan, design, construct and equip reservoir number 3,
including acquiring rights of way and property, in Aztec in San Juan county
AZTEC WATER TANK/TRANSMISSION LINES CONSTRUCT
five hundred thousand dollars ($500,000) to plan, design, construct and equip a water tank
and transmission lines for the northern Aztec water system, including acquiring rights of way
and property, in Aztec in San Juan county
BLOOMFIELD WATER LINES/FIRE HYDRANTS-NORTH 1ST ST
three hundred thousand dollars ($300,000) to plan, design, construct, purchase and install
water lines and fire hydrants along north First street in Bloomfield in San Juan county
.07HBAND001
pg_0002
HOUSE CAPITAL OUTLAY REQUEST
Page 2
to the department of transportation
SAN JUAN CO SERIES 4000 ROADS IMPROVE
one hundred thousand dollars ($100,000) to plan, design and construct improvements to
series 4000 roads in San Juan county
AZTEC MAIN STREET IMPROVE
five hundred thousand dollars ($500,000) to plan, design, construct and equip improvements
to Main street, including acquiring rights of way and property, in Aztec in San Juan county
to the higher education department
SJC CREATIVE ARTS CENTER CONSTRUCT
one hundred thousand dollars ($100,000) to plan, design, construct, equip and furnish the
creative arts center at San Juan college in Farmington in San Juan county
SJC OUTDOOR LEARNING CTR
one hundred thousand dollars ($100,000) to plan, design, construct, equip and furnish the
outdoor learning center at San Juan college in Farmington in San Juan county
SJC TRADES AND TECH BUILDING
one hundred thousand dollars ($100,000) to plan, design, construct, expand, equip and
furnish the trades and technology building at San Juan college in Farmington in San Juan
county
to the Indian affairs department
AZTEC HIGH SCHL NAVAJO DORMS CONSTRUCT
five hundred thousand dollars ($500,000) to plan, design and construct an honors dormitory
for Navajo students attending Aztec high school in Aztec in San Juan county
to the local government division of the department of finance and administration
SAN JUAN CO ARCHAEOLOGICAL CTR & LIBRARY ADDITION
one million five hundred thousand dollars ($1,500,000) to plan, design and construct an
addition to the San Juan county archaeological research center and library in Salmon ruins in
San Juan county
.07HBAND001
pg_0003
HOUSE CAPITAL OUTLAY REQUEST
Page 3
SAN JUAN CO SUBSTANCE ABUSE TRTMNT FCLTY CONSTRUCT
six hundred sixty-seven thousand dollars ($667,000) to plan, design, construct, renovate,
equip and furnish a substance abuse treatment facility in San Juan county
AZTEC ANIMAS RIVER REC FACILITIES/TRAILS/BRIDGES
five hundred thousand dollars ($500,000) to plan, design, construct and equip Animas river
recreation facilities, trails and bridges, including acquiring rights of way and property, in
Aztec in San Juan county
BLOOMFIELD EARLY CHILDHOOD CTR PLAYGROUND EQUIP
eighty thousand dollars ($80,000) to plan, design, construct, purchase and install playground
equipment at the Bloomfield early childhood center in Bloomfield in San Juan county
BLOOMFIELD FIRE & POLICE DEPTS RADIO/COMM EQUIP
three hundred thirty-five thousand dollars ($335,000) to purchase and install microwave
radio and communications equipment for the fire and police departments in Bloomfield in
San Juan county
BLOOMFIELD FIRE/POLICE/MUNICIPAL COURT FCLTY
five hundred thousand dollars ($500,000) to plan, design and construct improvements to the
fire station, police and municipal court facility in Bloomfield in San Juan county
BLOOMFIELD KEFFALOS BALL PARK LIGHTING INSTALL
three hundred thousand dollars ($300,000) to purchase and install equipment and field
lighting at the Keffalos ball park in Bloomfield in San Juan county
SAN JUAN CO DOMESTIC VIOLENCE SHELTER CONSTRUCT
two million dollars ($2,000,000) to plan, design, construct and equip a domestic violence
shelter and counseling center in San Juan county
SAN JUAN REGIONAL ANIMAL SHELTER
seventy-five thousand dollars ($75,000) for phase 1 of the San Juan regional animal shelter
project, including a feasibility study, plan and design of the facility, acquisition of property,
construction, equipment and furnishings, in Farmington in San Juan county
to the public education department
.07HBAND001
pg_0004
HOUSE CAPITAL OUTLAY REQUEST
Page 4
AZTEC MSD PERFORMING ARTS CTR CONSTRUCT
one million dollars ($1,000,000) to plan, design and construct a performing arts center for the
Aztec municipal school district in San Juan county
BLANCO ELEM SCHL ROOF REPLACE
four hundred forty thousand dollars ($440,000) to replace the roof at Blanco elementary
school in the Bloomfield school district in San Juan county
BLOOMFIELD HIGH SCHL AUDITORIUM ROOF REPLACE
ninety-six thousand dollars ($96,000) to replace the roof for the auditorium at Bloomfield
high school in the Bloomfield school district in San Juan county
MESA ALTA JR HIGH SCHL ROOF REPLACE
six hundred eighty thousand dollars ($680,000) to replace the roof at Mesa Alta junior high
school in the Bloomfield school district in San Juan county
NAABA ANI ELEM SCHL MAIN BOILER REPLACE
two hundred thousand dollars ($200,000) to replace the main boiler at Naaba Ani elementary
school in the Bloomfield school district in San Juan county
RIO VISTA MID SCHL ROOF REPLACE
three hundred eighty thousand dollars ($380,000) to replace the roof at Rio Vista middle
school in the Bloomfield school district in San Juan county
to the office of the state engineer
BLOOMFIELD DIVERSION POINT & RESERVOIR CONSTRUCT
five hundred thousand dollars ($500,000) to plan, design and construct a second diversion
point and a reservoir for raw water in Bloomfield in San Juan county
.07HBAND001